• Location:
    Bucze
  • Year:
    1993
  • Installed capacity:
    0,84 MW
  • Type:
    Run-of-river power plant
  • River/Lake:
    Nysa Łużycka
  • Object type:
    Elektrownia wodna
The plant was built in 1910 to power a nearby paper mill. In 1992–1993, the plant was thoroughly modernised, in line with the construction standards for small hydro plants (SHP). It is the first hydroelectric power plant in Poland equipped with submersible hydro generators. The plant is currently adapted to fully unmanned operation.
  • Bukówka Hydroelectric Power Plant

  • 66-627 Bobrowice
    Dychów 6A
  • (+48 68) 383 84 77
  • (+48 68) 383 68 75
pgeeo_site