• Location:
    Gorzupia
  • Year:
    1998
  • Installed capacity:
    1,68 MW
  • Type:
    Run-of-river power plant
  • River/Lake:
    Bóbr
  • Object type:
    Elektrownia wodna
The construction of the power plant started in 1996, as contracted by PGE Energia Odnawialna S.A. The decision to build it was based on the opportunity to increase the production output owing to the modernised damming potential of Gorzupia I.
The power plant is equipped with four Flygt submersible turbine sets (two sets with adjustable rotor blades) with the total capacity amounting to 1,680 kW and annual output amounting to 9,600 MWh. The Gorzupia II power plant has been launched in summer 1998.