• Location:
    Januszkowice
  • Year:
    2003
  • Installed capacity:
    1,4 MW
  • Type:
    Run-of-river power plant
  • River/Lake:
    Oder
  • Object type:
    Elektrownia wodna
The first of the barrages owned by the PGE Group, built on the Upper Oder, is equipped with two 0.7 MW Kaplan turbines. The plant consists of a water tight power house protected against the effects of flooding, an inlet canal with waste lead-in pier, an outlet canal and power output switchgear with an auxiliary power supply branch.
  • Januszkowice Hydroelectric Power Plant

pgeeo_site