• Location:
    Krapkowice
  • Year:
    2007
  • Installed capacity:
    1,26 MW
  • Type:
    Run-of-river power plant
  • River/Lake:
    Oder
  • Object type:
    Elektrownia wodna
A run-of-river hydroelectric plant, built at the 123rd kilometre of the Oder river, equipped with two double control Kaplan turbine sets in a skew arrangement. The plant‘s building is protected against the effects of flooding.
  • Elektrownia Wodna Krapkowice

pgeeo_site