• Location:
    Dąbrowa Łużycka
  • Year:
    2001
  • Installed capacity:
    1,312 MW
  • Type:
    Run-of-river power plant
  • River/Lake:
    Nysa Łużycka
  • Object type:
    Elektrownia wodna
The plant was erected on the right bank of the Nysa Łużycka River, at a gate weir. Destructed during World War 2, the plant was rebuilt and relaunched in 1962. PGE Energia Odnawialna S.A. modernised the facility again in 2003–2004.
  • Przysieka Hydroelectric Power Plant

  • 66-627 Bobrowice
    Dychów 6A
  • +48 (68) 383 84 77
  • +48 (68) 383 68 75
pgeeo_site