• Location:
    Raduszec Stary
  • Year:
    1935
  • Installed capacity:
    2,640 MW
  • Type:
    Run-of-river, back-up power plant
  • River/Lake:
    Bóbr
  • Object type:
    Elektrownia wodna
It is used to regulate the operation of the Dychów Hydroelectric Power Plant. To support its own operation, the plant relies on water from the lower reservoir of the Dychów Hydroelectric Power Plant.

The plant, built in the mid-1930s, is adjacent to the left abutment of the Raduszec Stary weir, 3 km up-river from the confluence of the Bóbr and Oder Rivers. The underground section houses two turbine chambers with Kaplan turbines and suction pipes.
  • Raduszec Stary Hydroelectric Power Plant

  • 66-627 Bobrowice
    Dychów 6A
  • (+48 68 ) 383 84 77
  • (+48 68 ) 383 68 75
pgeeo_site