• Location:
    Siedlec
  • Year:
    1905/1933
  • Installed capacity:
    1,387 MW
  • Type:
    Run-of-river power plant
  • River/Lake:
    Nysa Łużycka
  • Object type:
    Elektrownia wodna
The power plant is located in the town of Siedlec. The gate-controlled weir and the power house were built in 1905. Dammed up water is diverted to the plant via a 1,320 m canal. At present, the plant is equipped with three turbines – two Francis units and a Kaplan unit.
  • Zielisko Hydroelectric Power Plant

  • 66-627 Bobrowice
    Dychów 6A
  • (+48 68 ) 383 84 77
  • (+48 68 ) 383 68 75
pgeeo_site